Permits & Fees

Permit Type
Fee Amount
Aerial Photos (Scale of 1 inch to 200 inches) (per sheet)$20.00
Building Permit Review - 239F (Initial Review)$1500.00
Building Permit Review - 239F (Resubmission)$740.00
Dumpster Permit - (Must provide copy of insurance policy)$418.00
Dye Test (Lowest possible)$160.00 to $800.00
Dye Test (Highest possible)$800.00
GPS Monument Books (Benchmarks)$550.00
Hauling Permit (Must provide copy of insurance policy) (PDF)$150.00
Industrial Waste Discharge Permit$213.00
Plans and Specifications$300.00
Each project
Reproduction of Maps (per square foot)$18.00
Reproduction of Sewer Maps (per sheet)$126.00
Road Opening Permit Application - Residential (Including curb cuts) (Fee includes deposit) (Mail completed Road Opening Form) Road Opening Permit Application Form-Residential (PDF)
2016 Rules & Regulation Updates (PDF)
$275.00
Road Opening Inspection - Residential
$460.00 + deposit

Road Opening Permit Application - Commercial (Including curb cuts) (Fee includes deposit) (Mail completed Road Opening Form)
Road Opening Permit Application Form-Commercial (PDF)
2016 Rules & Regulation Updates (PDF)
$550.00
Road Opening Inspection - Commercial
$920.00 + deposit
Scavenger Waste (Bay Park only) (per 1,000 gallons)$53.00
Sewer Permit
(Mail completed Sewer Permit Form) Sewer Permit Application Form (PDF)
$140.00
Sewer Permit Inspection$460.00
Sidewalk Permit - Residential ONLY
(Mail completed Sidewalk Permit Form) Sidewalk Construction Application Form (PDF)
N/A
Special Permits (Commercial) (Lowest possible)$160.00 to $800.00
+2% estimated construction cost
Special Permits (Commercial) (Highest possible; 2% estimated construction cost included)$800.00
Standard Specifications (Civil engineering and site development construction)$520.00 Each
Standard Specifications (Traffic and sewer)$160.00
Subdivision Plan Review (Initial review; additional $300 per lot)$7,000.00 + $300.00 per lot
Subdivision Plan Review (Resubmission)$700.00
Verification of Permit Connection or Spur Location (each)$95.00
** + .5% of construction costs for projects over $250,000.000